9. “THE WRITTEN ACCEPTANCE” OF TENDER is for the first time made a contract document (p. 20), although that is overlooked in the Agreement (p. 21).

If an acceptance is qualified by refusing terms in the contractor’s tender or adding new terms, there is no contract unless and until the qualification is accepted by the contractor expressly or by starting work without objection. A qualified acceptance may be dangerous since it determines the contractor’s tender, which cannot subsequently be accepted (even without the qualification) unless it is renewed. g

10. No SCHEDULE OF RATES AND PRICES. The references to a schedule of rates and prices in the previous edition have been omitted because no function was assigned to the schedule.

11. “TENDER TOTAL” as defined here is referred to in cls. 10 (amount of bond) and 60 (4) (limit of retention).

This definition assumes that all errors in arithmetic in the tender will have been corrected prior to acceptance. Where errors remain, it is not absolutely clear that it is the correct total and not the stated total that applies. This ambiguity is unlikely to be of great practical importance.

12. “CONTRACT PRICE”. The payment due to the contractor depends on the classification of the contract, generally as either (a) pure lump sum; (b) quantities; (c) measure and value; or (d) cost plus.

(a) Pure lump sum. An agreement to complete a whole work—to build a house or a bridge or a dock—for a lump sum. In law this is an undertaking to get a certain result for a fixed sum of money. The contractor is entitled to that sum only, however difficult it may unexpectedly turn out to be to get the result:

Pure lump sum contract to lay the San Paulo Railway from terminus A to terminus B. As a result of errors in the engineer’s plan almost twice the quantities of excavation originally estimated were needed to complete the line.

Held: The contractor was entitled to no extra payment beyond the lump sum price in his tender. h

And no work indispensably necessary to get the result is an extra:

In a lump sum contract to build a house, flooring was omitted from the specifications.

Held: The contractor must put it in without extra payment, as it was clearly indispensably necessary to complete the house. i

Therefore in a pure lump sum contract the contract price will be altered only where the plans, etc., are varied by the employer because he decides that a change is preferable, although it is not absolutely necessary; not where the change is necessary to complete the project:

Pure lump sum contract to build a bridge. If it is found that the piling specified cannot support the superstructure, the contractor must change it without extra payment so far as necessary to complete the works. If the piles will support the superstructure but the engineer decides that a change is preferable to improve on the original scheme, he must give a variation order and the contractor will be entitled to extra payment for any additional work. j

And an express promise to pay extra for work in fact included in the contract price is not normally binding (pp. 3–4 and 179, N.2).

A contractor who agrees to a pure lump sum contract for work that is uncertain and unforeseeable in extent will be considered by the courts simply to have taken a voluntary gamble and will be bound by the contract. judges in the early cases which settled the law was clearly influenced by the feeling that an employer obtains a tender and fixes a contract price for work in order to know what he is in for, and that any relaxation of these rules would destroy the whole object of getting a tender. This, of course, ignores the difference in extent and difficulties between large-scale engineering works and the ordinary relatively simple building work. Nevertheless, following from this attitude the courts hold that in inviting a tender there is no implied guarantee by the employer that the plans, bill of quantities or specifications supplied to tenderers are accurate, or that the work can be carried out in accordance with them:

By the plans to build Blackfriars Bridge the foundations were to be put in with caissons. The contractors found this impossible and eventually had to abandon the attempt and complete the bridge in accordance with altered plans.

Held: While they were entitled to the contract payments for the original work actually completed and, under the particular form of contract, to extra for the work in the new plans, they were not entitled to damages for the added expense and delay in trying to do the original work. k

The courts hold that in putting forward plans, specifications and a bill of quantities with the invitation to tender, the employer is merely putting forward the estimate of an engineer as to how the required result may be achieved—he is not guaranteeing that the engineer is right. The courts know that it is the custom for the contractor to rely on these documents, but insist that if he does that to save himself trouble in tendering, it is “a usage of blind confidence”. l

But since that last decision in 1876 much development has taken place around this area of law and the employer is liable for misleading contract documents in the several cases discussed on pp. 58–63.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 199,902评论 5 468
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 84,037评论 2 377
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 146,978评论 0 332
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 53,867评论 1 272
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 62,763评论 5 360
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,104评论 1 277
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,565评论 3 390
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,236评论 0 254
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,379评论 1 294
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,313评论 2 317
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,363评论 1 329
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,034评论 3 315
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,637评论 3 303
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,719评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 30,952评论 1 255
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 42,371评论 2 346
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 41,948评论 2 341

推荐阅读更多精彩内容