2022-05-17(243)Engineering law and the ICE Contracts

11. “IN WHAT RESPECTS…(THE CONTRACTOR’S PROPOSED METHODS) FAIL TO MEET THE REQUIREMENTS OF THE DRAWINGS OR SPECIFICATION OR WILL BE DETRIMENTAL TO THE PERMANENT WORKS”. These two are the only grounds on which the engineer may refuse consent to the contractor’s methods of construction or use of constructional plant under this clause. They are discussed above in N. 7 and 8 and in N. 21.

12. “THE CONTRACTOR SHALL TAKE SUCH STEPS OR MAKE SUCH CHANGES… TO MEET THE ENGINEER’S REQUIREMENTS”. Under para. (b) the engineer tells the contractor in what respects the contractor’s proposed methods fail to meet the relevant requirements (N. 11), but the contractor chooses the steps to be taken and the changes to be made to satisfy the requirements and by implication reapplies for consent. If the engineer lays down positive requirements in instructions, it is possible that the contractor may have a claim under cl. 13 (p. 73, N. 6) apart from his rights under sub-cl. (6).

13. “THE CONTRACTOR SHALL NOT CHANGE THE METHODS WHICH HAVE… THE ENGINEER’S CONSENT WITHOUT THE FURTHER CONSENT IN WRITING OF THE ENGINEER WHICH SHALL NOT BE UNREASONABLY WITHHELD”. The engineer may reasonably refuse consent only if as a result of the change the temporary works would fail to meet the requirements of the drawings, etc., as set out in para. (b) of this sub-clause. Refusal of consent to change approved methods appears to imply “requirements” of the engineer, giving the contractor a right to compensation under sub-cl. (6).

14. THE ENGINEER SHALL PROVIDE “DESIGN CRITERIA…AS MAY BE NECESSARY TO ENABLE THE CONTRACTOR TO COMPLY”. A prudent engineer will supply these criteria with the tender documents, to minimise claims under sub-cl. (6).

If the engineer negligently misstates the actual design criteria the contractor nevertheless appears to be liable for damage to the works resulting from design of temporary works based on the criteria stated, since the excepted risk in cl. 20 (3) of a design fault is not worded so as to apply in that case (p. 97). The contractor (or his insurers by subrogation—p. 98, footnote (q)) may then have a remedy against the engineer outside of the contract to recover the cost of making good the damage, and the contractor may similarly have a remedy where the engineer’s negligence causes him to construct unnecessarily expensive temporary works. This important topic of liability for negligence outside the terms of the construction contract is discussed on p. 393.

15. “ENGINEER’S CONSENT TO THE PROPOSED METHODS…UNREASONABLY DELAYED”. See p. 365 on what constitutes unreasonable delay.

This provision covers delay with the original consent, delay in giving consent following the contractor taking steps or making changes to meet the engineer’s requirements, and apparently also delay in giving consent to a change in methods which have already been approved, within sub-cl. (4).

16. EXTRA PAYMENT WHERE “THE REQUIREMENTS OF THE ENGINEER…OR ANY LIMITATIONS…COULD NOT REASONABLY HAVE BEEN FORESEEN BY AN EXPERIENCED CONTRACTOR”. The requirements of the engineer as enshrined in the drawings and specification are of course known to the contractor at the date of tender (unless there is a variation under cl. 51—see N. 4, p. 170).

This right to extra payment therefore will take effect only in relation to an unreasonable application of standards left to the discretion of the engineer by the specification (e.g. “as the Engineer shall require”) or engineer’s requirements designed to avoid detriment to the permanent works after completion. It would hardly be a valid argument in law that the contractor did not foresee that the engineer would fully enforce detailed requirements of a specification, despite the normal practice not to “apply the book” rigidly (discussed on p.445). i′

The effect of this clause is to give the contractor some (N. 21) protection against unreasonableness on the part of the engineer in relation to temporary works. The engineer may be wise in order to minimise claims under this clause to include in the specification detailed requirements for methods of construction, materials and workmanship of all temporary works, including a required factor of safety. To do so is not unfair to the contractor, who will know at the time of tender what the engineer’s requirements for temporary works are and will have an opportunity to price accordingly. 

The hallowed phrase “could not reasonably have been foreseen” is discussed in N. 4,p. 65.

17. “AT THE TIME OF TENDER”. See p. 57, N. 2.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 205,386评论 6 479
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 87,939评论 2 381
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 151,851评论 0 341
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 54,953评论 1 278
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 63,971评论 5 369
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,784评论 1 283
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 38,126评论 3 399
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,765评论 0 258
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 43,148评论 1 300
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,744评论 2 323
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,858评论 1 333
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,479评论 4 322
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 39,080评论 3 307
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 30,053评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 31,278评论 1 260
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 45,245评论 2 352
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 42,590评论 2 343

推荐阅读更多精彩内容