2022-05-05(231)Engineering law and the ICE Contracts

7. “AND SHALL…WITH THE NOTICE…GIVE DETAILS…OF THE MEASURES HE is TAKING OR PROPOSING TO TAKE”. Note that it is the contractor who must decide what measures are necessary to deal with the difficulties—N. 8. The contractor is not bound to give details of any measures he has already completed, although apparently he may recover extra payment for them—N. 6 and 17.

The results under cl. 52 (4) of failure to give a notice do not appear to apply to absence of this information “with the notice”. Under the general law it seems that failure to give the information does not automatically invalidate a claim, because this clause does not say that it does, but see N. 8. Failure to give the information also may make it difficult for the contractor to persuade the engineer or an arbitrator of the merits of his claim.

8. “FOLLOWING RECEIPT OF A NOTICE…THE ENGINEER MAY IF HE THINKS FIT”. Since he has a general duty “to complete the Works”, by cl. 3 of the Form of Agreement and cl. 8 (1) of these Conditions, for example, the contractor is bound in the first instance to determine what measures are necessary to achieve completion despite unforeseen conditions or obstructions, and to give details under sub-cl. (1), after which the engineer may take, or even be bound to take, a measure of control under this sub-cl.(2).

The ideal procedure under this clause is that as soon as he encounters the difficulties the contractor notifies the engineer (N. 6), giving details of the measures he proposes to take to deal with them (N. 7). The contractor will point out if a change of design is necessary to cope with the difficulties at a reasonable cost and within a reasonable time and will draw the engineer’s attention to the consequential necessity or desirability of a variation order under sub-cl. (2), and will also draw the engineer’s attention to any other action required under that sub-clause. The contractor will also seek the approval of the engineer under para. (b) before proceeding, to minimise the risk of the engineer or arbitrator holding that cost incurred was unreasonable. The functions of the engineer are dealt with more specifically in the following six notes.

Unfortunately the symmetry of this procedure may be upset because the notice by the contractor may not be given until the unforeseen conditions or obstructions have been dealt with by him for a time (N.6). The engineer need not wait for such notice to take any of the steps mentioned in paras. (b)–(d) of this sub-clause if he knows what is happening:

he is at all times during the progress of the works entitled to give an instruction or suspension or variation order and he may intimate that measures do or do not have his approval under cl. 13 (2). If he does not know what is happening the engineer will be at a disadvantage. For example, he may lose the opportunity to change design to reduce the extra cost due to the conditions or obstructions. That is one reason why an arbitrator should enforce cls. 12 (1) and 52 (4) (d) about notices and particulars, and if the contractor does breach those lax requirements resulting in such a lost opportunity, the employer may counter-claim for his losses against the contractor’s claim for extra cost under this clause.

The words “if he thinks fit” are peculiar to this clause and cl. 44 (2), but in this context do not appear to be different in effect to the many references in the Conditions to the engineer deciding according to his own opinion. The engineer hardly could be entitled to refuse approval for satisfactory and proper measures proposed by the contractor, and as to variations and suspension orders see specifically p. 169, N.3. and p. 131, N.2.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 199,830评论 5 468
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 83,992评论 2 376
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 146,875评论 0 331
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 53,837评论 1 271
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 62,734评论 5 360
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,091评论 1 277
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,550评论 3 390
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,217评论 0 254
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,368评论 1 294
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,298评论 2 317
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,350评论 1 329
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,027评论 3 315
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,623评论 3 303
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,706评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 30,940评论 1 255
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 42,349评论 2 346
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 41,936评论 2 341

推荐阅读更多精彩内容