Lean leadership


To implement Lean is not an initiative and is a long-term journey.

Area-Specific Interpretation


Nine core elements - a framework for the Lean development model

Employee empowerment:
Management provides clear guidance for employees on expected results and skills.All involved people stick to decisions and follow the fair process principles of discuss, decide, execute.
Employees have the authority to decide the best way to do their work. They also take responsibility for the results of their actions.

QCD in one hand:
Product Owner is accountable for Quality, Cost and Delivery of a product or service throughout the entire product lifecycle.

Cross-functional team:
The basic unit of planning and execution is an elementary, cross-functional team, whose size varies from five to 12members.
Work is planned at the team level, rather than the individual level.

Prioritized backlog at all times:
A prioritized and ranked backlog is available at all times.
The different backlogs (product, release and sprint) provide a comprehensive end-to-end breakdown, from customer and stakeholder requirements to the tasks of the implementation teams.
The backlog is a living artifact because its entries can be re-prioritized by the responsible Product Owner. It is used by all teams as the instrument to steer their work.

Takt:
All work within a program is organized in time-boxed iterations with a well-defined length known as a takt.
A takt comprises a complete “Define, Build, Test and Accept” cycle and strives for built-in quality.
A takt length is fixed, between 2 and 6 weeks and enables frequent validation with customers and stakeholders and a faster response to feedback.
Each takt has a well-defined objective set by the Product Owner.

Standard process:
A standard process, based on agile methods, with a set of defined rules and feedback loops is documented and used.
The process leaves enough room for individual practices and creativity.

Usable software each takt:
At the end of each takt a software increment, which can be easily consumed and validated by the customer / stakeholder, is delivered.

Transparency of processes and product maturity:
A basic and minimal set of KPIs is defined and communicated to the relevant teams.
KPIs are measured, evaluated and validated with dedicated pilot teams. KPIs are used within program reporting.

Continuous improvement process and structure:
The continuous improvement process (CIP) is designed to constantly evaluate and improve processes, established in the overall organization and actively supported by all employees.

Eliminate waste


Differentiate between activities that add value and those that cause waste to increase efficiency.


General ideas

  • Activities with added value the customer is willing to pay for.
  • Activities with obvious waste do not make an obvious contribution to value creation
  • Activities with hidden waste do not contribute to value creation but need to be carried out

**Identifying Waste **

If it does not add to product value, then it is a waste

Ask three questions:

  • Which of the tasks performed are essential for the production process?
  • Which of the tasks only increase product cost instead of product value?
  • Which of the tasks have a genuine influence on what customers see or on what is important to them?

Guidance

  • Eliminate waste (replace waste with value-adding tasks) to increase the proportion of value-adding tasks. Do not add more workload.
  • To eliminate any excess safety buffer is the recommended method of reducing waste.
Reducing Waste One Small Step at a Time
  • The vision of Lean is a low-waste process that is achieved by means of the JIT system (will be introduced soon).

Continuous Improvement


Continuous improvement is an ongoing, never-ending process.

Comprise Go and See, Kaizen and Perfection Challenge to build a culture of intervening in and fixing problems.

  • The full implication of Go and See, especially for managers, is to frequently spend time at the real place of work, build relationships of trust with the employees, and help them fix things.

  • Kaizen means ongoing improvement, in small and achievable steps, involving everyone, including both managers and employees.

  • The idea of Perfection Challenge is to repeat cycles of improvement experiments indefinitely; to never be satisfied with the status quo.

Respect for people


(advice for managers)

  • Good people build good products -> Develop people, then build products.

Understand and act on the goals of “eliminating waste” and “continuous improvement” in actions and decisions.

  • Respect the knowledge of the individual as part of a team. Develop and empower teams:

    • Commitment to education and development

    • Don’t force employees to do wasteful work and don’t make them wait

    • Don’t impose wishful thinking on employees and don’t overload them

Maximize Customers value and speed


QCD Relationship
最后编辑于
©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 204,053评论 6 478
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 85,527评论 2 381
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 150,779评论 0 337
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 54,685评论 1 276
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 63,699评论 5 366
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,609评论 1 281
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,989评论 3 396
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,654评论 0 258
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,890评论 1 298
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,634评论 2 321
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,716评论 1 330
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,394评论 4 319
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,976评论 3 307
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,950评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 31,191评论 1 260
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 44,849评论 2 349
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 42,458评论 2 342

推荐阅读更多精彩内容

  • **2014真题Directions:Read the following text. Choose the be...
    又是夜半惊坐起阅读 9,363评论 0 23
  • 席慕蓉曾经说过:“如果一个孩子在他的生活里没接触过大自然,譬如摸过树的皮、踩过干而脆的落叶,他就没办法教他美术。因...
    花花的日常阅读 793评论 0 2
  • 有几天没有写字了,这几天忙乱的也不知道自己在干嘛呢? 现在正在去北京的卧铺车箱里面,自从开通了广州到郑州的高铁以后...
    墨吟书阅读 158评论 0 0
  • 首先我们需要知道css伪类是用来添加一些选择器的特殊效果。 link表示的是正常情况下链接的样式。 visit代表...
    饥人谷_张颖莹阅读 4,956评论 3 5
  • 有些时候觉得没有什么好记录的,晚上3点从店里回到家。第二天早上12点起床开门,然后收拾店里,卖东西。下午看看书或睡...
    曾曾的麻麻阅读 247评论 0 0