3. “…WITHOUT THE WRITTEN CONSENT OF THE EMPLOYER”. Note that in these two cases (N. 1 and 2) it is the written consent of the employer and not merely of the engineer which is necessary. The employer’s right to refuse consent is absolute and the contractor has no right to challenge it either in the courts or in arbitration. As to waiver of written consent see cl. 47, N. 11.

4. “THE CONTRACTOR SHALL NOT SUB-LET THE WHOLE OF THE WORKS… THE CONTRACTOR SHALL NOT SUB-LET ANY PART OF THE WORKS WITHOUT THE WRITTEN CONSENT OF THE ENGINEER”. The position in the absence of a special term in the contract is that although he may not assign his liability so as to rid himself of it (see N. 1) a party ordinarily may sub-let the contract work, that is, have it carried out physically by someone else but remaining himself solely liable to the other party to the contract for the result. As the rest of this clause sets out, sub-letting and not assignment of liability is the basis of the sub-contracting system; the main contractor remains solely liable to the employer for the quality of all the work but, with consent where necessary, employs others to carry out parts or to supply material.

This clause requires consent to sub-letting and the main contractor will not be entitled to payment for work sub-let without consent, even though the sub-contractor’s work is satisfactory. The employer has contracted to pay only for physical performance of the contract by the original contractor; if he does not get that it is not for him to prove in what way the work might have been better if he had. The analogy is with the case of an author employed to write a book, who is obviously not entitled to payment if without consent he has someone else write it for him, however good the result. The fact that the employer may necessarily keep the benefit of the work by the sub-contractor does not affect the legal position—see case pp. 266–7.

By cl. 63 (1) (e) the employer has a right of forfeiture in some cases of wrongful sub-letting. Where he does not wish to forfeit the whole contract, and it may be that because the contractor knows this the threat to do so has no effect, it should be enough to discourage sub-contracting if it is pointed out that neither the main contractor nor the sub-contractor (p. 223) will be entitled to recover payment for the sub-contractor’s work.

It is clear on general principles that the written consent of the engineer must be given before a sub-letting is made, so that the arbitrator cannot validate a sub-letting made by the contractor without asking for consent—see p. 302, N. 13. If the contractor does ask for consent, an arbitrator may under cl. 66 “review and revise…(the Engineer’s) decision” to refuse consent. However, that remedy is not effective for the contractor. He is not entitled to arbitration before completion of the works unless the engineer refuses to certify for some payment because of the sub-letting (cl. 66(2)), and (as this clause does not require the engineer’s consent to be reasonable) the arbitrator does not appear to have power eventually to award damages to the contractor, even if loss can be proved (p. 417).

In the absence of regulation in the construction contract, sub-contracting by the contractor without the employer’s consent still in many cases will be a breach of contract. It will be a breach so far as the circumstances show that the exercise by the original contractor of his particular skill or judgment in relation to the construction of the works was to the employer a material consideration in entering into the contract with him.

The contractor will, of course, use employees, but there is a real difference between that and sub-letting. The contractor has full practical and legal powers to organise and control the work of his employees, but in the absence of special agreement only very limited control over independent sub-contractors. The problems which the engineer should therefore consider before agreeing to a sub-contract are dealt with on pp. 222–3.

For the engineer’s power to order a sub-contractor or sub-contractor’s employee to be removed from the works see p. 85, N. 6.

5. THE ENGINEER’S AUTHORITY TO CONSENT TO A SUB-CONTRACT. The engineer has by this clause apparent authority to consent to a sub-contract, so that his consent is generally effective so far as the contractor is concerned even if the employer did not authorise it, but the engineer may be liable to the employer—p. 399.

6. “CONTRACTOR…RESPONSIBLE FOR…ANY SUB-CONTRACTOR”. See p.221.

7. “PROVISION OF LABOUR ON A PIECE-WORK BASIS…NOT…SUB-LETTING”. Apparently the provision of labour referred to is not restricted to the provision by a worker of his own labour. The intention appears to be to make it unnecessary for the contractor to obtain consent to a “labour only” sub-contract, despite the many problems created by that form of sub-contracting. t

8. THIS CLAUSE HAS BECOME PARTLY MISLEADING because of the new cls.59A and 59B about nominated sub-contractors.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 199,902评论 5 468
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 84,037评论 2 377
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 146,978评论 0 332
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 53,867评论 1 272
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 62,763评论 5 360
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,104评论 1 277
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,565评论 3 390
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,236评论 0 254
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,379评论 1 294
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,313评论 2 317
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,363评论 1 329
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,034评论 3 315
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,637评论 3 303
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,719评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 30,952评论 1 255
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 42,371评论 2 346
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 41,948评论 2 341

推荐阅读更多精彩内容