2022-04-24(221)Engineering law and the ICE Contracts

2. “THE CONTRACTOR SHALL TAKE FULL RESPONSIBILITY FOR THE ADEQUACY STABILITY AND SAFETY OF ALL SITE OPERATIONS AND METHODS OF CONSTRUCTION”—RESPONSIBILITY FOR TEMPORARY WORKS. This is a suitable place to deal with a matter on which clear guidance from the law is of great practical importance, but unfortunately is lacking. The complex question of responsibility for temporary works may be analysed under four headings: (i) responsibility of the contractor to the employer; (ii) responsibility of the engineer to his client; (iii) responsibility (or rather lack of responsibility) of the employer via his engineer to the contractor as such; and (iv) responsibility of the employer, engineer and contractor to employees and members of the public.

(i) The contractor’s responsibility to the employer is clear-cut. By this clause the contractor is responsible for the “adequacy stability and safety of all site operations and methods of construction”, but not for the design of temporary works designed by the engineer. If temporary works not designed by the engineer (i.e. designed by the contractor or a sub-contractor, including a nominated sub-contractor (p. 229)) are inadequate or defective the contractor must supplement or rectify them in order to perform his contract by completing the permanent works. If damage to the permanent or temporary works does occur as a result of such deficiencies, the contractor (or his insurers) are liable under cls. 20 and 21.

In the process of achieving satisfactory temporary works the contractor may become entitled to extra payment (pp. 87 and 170), but the engineer’s approval of temporary works does not relieve the contractor of liability (cl. 14 (7)). For the engineer’s other powers of control see cls. 13, 39, 40,49 and 51.

(ii) The engineer undoubtedly has a duty to his client to ensure that the completed permanent works will not be adversely affected by stresses due to the contractor’s temporary works, and that duty he carries out in the first instance by a proper specification, by actually designing temporary works where it would not be satisfactory to leave the design to the contractor, and by exercising his powers of control, keeping in mind the dangers of opening the way to claims (above). The engineer must also ensure that temporary works are in fact built in accordance with his or the contractor’s design, at least in so far as necessary to avoid detriment to the completed permanent works.

One of the problem areas is whether the engineer has any duty to his client to see that temporary works are designed and built satisfactorily even in respect of defects that will not have physical repercussions on the completed permanent works. A relevant consideration is that the employer seeks works finished on time, not a right to damages against the contractor, and a serious failure of temporary works may delay completion of the permanent works. In addition, even if he is entitled to an indemnity from the contractor the employer scarcely will be happy to have injuries to life in the course of works being constructed for him. Actual or threatened damage to neighbouring property may halt the permanent works by way of an injunction (p. 430). It is suggested that given the terms of cls. 8 (2) and 14 (3) and the protection obtained by the employer from the contractor’s liability (and insurance), and in the absence of any special term in the engineer’s service contract, the true position is that the engineer has a limited duty. That duty (it is submitted) is to take steps to have remedied any defects in the methods or results of constructing temporary works that are apparent on the normal site inspections, but not to go out of his way to prevent or search for such defects independently of his design and inspection of permanent work. jj

(iii) It is worth emphasising that the engineer has no duty to the contractor as such to detect or prevent faults in temporary works (or the permanent works). The engineer is appointed to protect the employer, not the contractor. The argument often put forward in practice that it is somehow an excuse for faults in workmanship or materials that they were not objected to by the engineer or resident, is to imply that the employer is in a worse position if he engages engineers to supervise the contractor than if he does not. In particular the engineer has rights of control under cls. 8, 13 and 14, not duties, and refer to cl. 39 (3). kk

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 199,902评论 5 468
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 84,037评论 2 377
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 146,978评论 0 332
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 53,867评论 1 272
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 62,763评论 5 360
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,104评论 1 277
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,565评论 3 390
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,236评论 0 254
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,379评论 1 294
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,313评论 2 317
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,363评论 1 329
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,034评论 3 315
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,637评论 3 303
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,719评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 30,952评论 1 255
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 42,371评论 2 346
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 41,948评论 2 341

推荐阅读更多精彩内容