2022-05-13(239)Engineering law and the ICE Contracts

PROGRAMME TO BE FURNISHED

14. (1)1 Within 21 days after the acceptance of his Tender the Contractor shall submit to the Engineer for his approval a programme showing the order of procedure2 in which he proposes to carry out the Works and thereafter shall furnish such further details and information as the Engineer may reasonably require in regard thereto.3 The Contractor shall at the same time also provide in writing for the information of the Engineer a general description of the arrangements and methods of construction which the Contractor proposes to adopt for the carrying out of the Works.4

REVISION OF PROGRAMME

(2) Should it appear to the Engineer at any time that the actual progress of the Works does not conform with the approved programme5 referred to in subclause (1) of this Clause the Engineer shall be entitled to require the Contractor to produce a revised programme showing the modifications to the original programme necessary to ensure completion of the Works or any Section within the time for completion as defined in Clause 43 or extended time granted pursuant to Clause 44 (2).5a

METHODS OF CONSTRUCTION

(3) If requested by the Engineer the Contractor shall submit at such times and in such detail as the Engineer may reasonably require6 such information pertaining to the methods of construction (including Temporary Works and the use of Constructional Plant) which the Contractor proposes to adopt or use and such calculations of stresses strains and deflections that will arise in the Permanent Works or any parts thereof during construction from the use of such methods as will enable the Engineer to decide whether if these methods are adhered to the Works can be executed in accordance with the Drawings and Specification7 and without detriment to the Permanent Works when completed.8,9

ENGINEER’S CONSENT

(4) The Engineer shall inform the Contractor in writing within a reasonable period after receipt of the information10 submitted in accordance with sub-clause (3) of this Clause either:

(a) that the Contractor’s proposed methods have the consent of the Engineer; or

(b) in what respects in the opinion of the Engineer they fail to meet the requirements of the Drawings or Specification or will be detrimental to the Permanent Works.11

In the latter event the Contractor shall take such steps or make such changes in the said methods12 as may be necessary to meet the Engineer’s requirements and to obtain his consent. The Contractor shall not change the methods which have received the Engineer’s consent without the further consent in writing of the Engineer which shall not be unreasonably withheld.13

DESIGN CRITERIA

(5) The Engineer shall provide to the Contractor such design criteria relevant to the Permanent Works or any Temporary Works designed by the Engineer as may be necessary to enable the Contractor to comply14 with sub-clauses (3) and (4) of this Clause.

DELAY AND EXTRA COST

(6) If the Engineer’s consent to the proposed methods of construction shall be unreasonably delayed15 or if the requirements of the Engineer pursuant to sub-clause (4) of this Clause or any limitations imposed by any of the design criteria supplied by the Engineer pursuant to sub-clause (5) of this Clause could not reasonably have been foreseen by an experienced contractor16 at the time of tender17 and if in consequence of any of the aforesaid the Contractor unavoidably incurs delay or cost18 the Engineer shall take such delay into account in determining any extension of time to which the Contractor is entitled under Clause 44 and the Contractor shall subject to Clause 52 (4) be paid in accordance with Clause 6019 such sum in respect of the cost incurred as the Engineer considers fair in all the circumstances.20,21

RESPONSIBILITY UNAFFECTED BY APPROVAL

(7) Approval by the Engineer of the Contractor’s programme in accordance with sub-clauses (1) and (2) of this Clause and the consent of the Engineer to the Contractor’s proposed methods of construction in accordance with sub-clause (4) of this Clause shall not relieve the Contractor of any of his duties or responsibilities under the Contract.

©著作权归作者所有,转载或内容合作请联系作者
  • 序言:七十年代末,一起剥皮案震惊了整个滨河市,随后出现的几起案子,更是在滨河造成了极大的恐慌,老刑警刘岩,带你破解...
    沈念sama阅读 199,830评论 5 468
  • 序言:滨河连续发生了三起死亡事件,死亡现场离奇诡异,居然都是意外死亡,警方通过查阅死者的电脑和手机,发现死者居然都...
    沈念sama阅读 83,992评论 2 376
  • 文/潘晓璐 我一进店门,熙熙楼的掌柜王于贵愁眉苦脸地迎上来,“玉大人,你说我怎么就摊上这事。” “怎么了?”我有些...
    开封第一讲书人阅读 146,875评论 0 331
  • 文/不坏的土叔 我叫张陵,是天一观的道长。 经常有香客问我,道长,这世上最难降的妖魔是什么? 我笑而不...
    开封第一讲书人阅读 53,837评论 1 271
  • 正文 为了忘掉前任,我火速办了婚礼,结果婚礼上,老公的妹妹穿的比我还像新娘。我一直安慰自己,他们只是感情好,可当我...
    茶点故事阅读 62,734评论 5 360
  • 文/花漫 我一把揭开白布。 她就那样静静地躺着,像睡着了一般。 火红的嫁衣衬着肌肤如雪。 梳的纹丝不乱的头发上,一...
    开封第一讲书人阅读 48,091评论 1 277
  • 那天,我揣着相机与录音,去河边找鬼。 笑死,一个胖子当着我的面吹牛,可吹牛的内容都是我干的。 我是一名探鬼主播,决...
    沈念sama阅读 37,550评论 3 390
  • 文/苍兰香墨 我猛地睁开眼,长吁一口气:“原来是场噩梦啊……” “哼!你这毒妇竟也来了?” 一声冷哼从身侧响起,我...
    开封第一讲书人阅读 36,217评论 0 254
  • 序言:老挝万荣一对情侣失踪,失踪者是张志新(化名)和其女友刘颖,没想到半个月后,有当地人在树林里发现了一具尸体,经...
    沈念sama阅读 40,368评论 1 294
  • 正文 独居荒郊野岭守林人离奇死亡,尸身上长有42处带血的脓包…… 初始之章·张勋 以下内容为张勋视角 年9月15日...
    茶点故事阅读 35,298评论 2 317
  • 正文 我和宋清朗相恋三年,在试婚纱的时候发现自己被绿了。 大学时的朋友给我发了我未婚夫和他白月光在一起吃饭的照片。...
    茶点故事阅读 37,350评论 1 329
  • 序言:一个原本活蹦乱跳的男人离奇死亡,死状恐怖,灵堂内的尸体忽然破棺而出,到底是诈尸还是另有隐情,我是刑警宁泽,带...
    沈念sama阅读 33,027评论 3 315
  • 正文 年R本政府宣布,位于F岛的核电站,受9级特大地震影响,放射性物质发生泄漏。R本人自食恶果不足惜,却给世界环境...
    茶点故事阅读 38,623评论 3 303
  • 文/蒙蒙 一、第九天 我趴在偏房一处隐蔽的房顶上张望。 院中可真热闹,春花似锦、人声如沸。这庄子的主人今日做“春日...
    开封第一讲书人阅读 29,706评论 0 19
  • 文/苍兰香墨 我抬头看了看天上的太阳。三九已至,却和暖如春,着一层夹袄步出监牢的瞬间,已是汗流浃背。 一阵脚步声响...
    开封第一讲书人阅读 30,940评论 1 255
  • 我被黑心中介骗来泰国打工, 没想到刚下飞机就差点儿被人妖公主榨干…… 1. 我叫王不留,地道东北人。 一个月前我还...
    沈念sama阅读 42,349评论 2 346
  • 正文 我出身青楼,却偏偏与公主长得像,于是被迫代替她去往敌国和亲。 传闻我的和亲对象是个残疾皇子,可洞房花烛夜当晚...
    茶点故事阅读 41,936评论 2 341

推荐阅读更多精彩内容